Generating Capacity

 
Total installed capacity of JSC WGC-3 thermal power plants is 8 497 MW.
 
Power Plant,
Installed Capacity
Type of Fuel
Equipment Specifications
Year of Commissioning
Pechorskaya SDPP
1,060 MW
natural gas / fuel oil
3 blocks of 210 MW each
1979–1984
2 blocks of 215 MW each
1987–1991
Cherepetskaya SDPP
1,425 MW
coal / fuel oil
4 blocks of 140 MW each
1953-1958
2 blocks of 300 MW each
1963-1964
1 block of 265 MW
1966
Kostromskaya SDPP
3,600 MW
natural gas / fuel oil
8 blocks of 300 MW each
1969-1973
1 block of 1,200 MW
1980
Yuzhnouralskaya SDPP
882 MW
natural gas / coal / fuel oil
2 turbogenerators of 50 MW each
1952
1 turbogenerator of 35 MW
1953
1 turbogenerator of 100 MW
1954
2 turbogenerators of 82 MW each
1956
2 turbogenerators of 200 MW each
1961
1 turbogenerator of 83 MW
1996
Gusinoozerskaya SDPP
1,100 MW
coal / fuel oil
2 blocks of 170 MW each
1976-1978
2 blocks of 180 MW each
1977-1979
2 blocks of 200 MW each
1988-1992
Kharanorskaya SDPP
430 MW
coal / fuel oil
2 blocks of 215 MW each
1995-2001